This is our to-do list - I will update with links and cross off items as they are completed.
Downstairs bedrooms
Paint and carpetInstall new wardrobes
Reconfigure doorsInstall cabinetsBuild in cabinetsHave floor repaired and refinishedTile backsplashComplete plastering and painting
Remove wall between lounge and passageGib over exposed sarkingPlaster and paint- Have floor repaired and refinished
Install new window on north-facing wall
Finish building interior walls (!)Plaster and paintTile floorInstall bathroom fixtures
Reconfigure doorsRemove old kitchen fittingsReline ceiling and walls- Add door out to patio
Install Murphy bed and storagePlaster and paintCarpet floor
OrganisePlaster and paintCarpet floor
Install storage- Reline back wall to resolve dampness
Paint
Make banister safePlaster and paint
Fence patio areaWaterblast and paint retaining wall- Fence south boundary
- Fence along top of retaining wall
- Fence front boundary
Build deck and landscape lawn on south side and add french doors from dining room- Add banister on stairs to front door
- Set up compost
- Create vege garden
- Plant fruit trees
Shift switchboard and replace old wiringHeating- Sort out drainage outside
Add vapour barrier and/or insulation underfloorAdd extra ceiling insulation